The Dixie Fix Plan (Dixie Highway Corridor Access Management Redevelopment Plan) is a long range planning approach to relieve congestion problems and provide better access to Dixie Highway. It was conducted to identify transportation planning and design solutions to address Dixie Highway’s informal status as the most heavily traveled and congested arterial in Kenton County.

Several factors are blamed for Dixie’s transportation problems including forty-four signalized intersections and scores of curb cuts along the eight-mile corridor that permit continuous, full vehicular access. Dixie provides direct access to a variety of business and institutional facilities for nine cities in Kenton County and one city in Boone County. In addition, it serves as a connector for personal, commuter, and commercial traffic on a local and regional basis. Due to its parallel alignment and close proximity to I-71/75, Dixie Highway is commonly used as an alternate route during interstate incidents or during peak hour interstate congestion. 44 traffic signals and over 400 access points (driveways), combined with narrow four-lane segments that lack turn lanes, contributes to travel delays and high accident rates.

As an aging corridor with increased traffic demands, it is necessary to pursue opportunities for improving safety, travel efficiency, and quality of life along Dixie Highway. The Dixie Fix Plan for access management provides a collaborative and proactive approach for local, county and state governments, organizations, and citizens to identify problem areas. With its completion, The Dixie Fix Plan proposes solutions for achieving these goals.

The goals of The Dixie Fix Plan are to:

- Improve safety

- Improve mobility

- Maintain reasonable and adequate access to Dixie Highway properties

- Foster economic development

- Increase environmental stewardship through development of multi-modal options and site design standards

- Improve aesthetics

Operational improvements can mitigate Dixie Highway’s problems, but any significant improvement must involve access management. Access management is the process that provides access to land development while simultaneously preserving the flow of traffic on the surrounding road system in terms of safety, capacity and speed. To succeed, access management would have to be implemented systematically through the coordinated effort and persistent commitment of local governments in the corridor.

The Plan has two major components: (1) a prioritized list of 36 projects taken from a total of 168 short- and long-term site specific access management recommendations and (2) each chapter outlines different, yet critical guidelines that serve as implementation standards such as future right-of-way widths, transit stop improvements, expanded bicycle and pedestrian accommodations, and increased streetscape/design measures.

In addition to these recommended improvements, The Dixie Fix Plan provides a draft Ordinance, draft Memorandum of Understanding, and the discussion of numerous potential funding sources as references for use in advancing immediate implementation.

The Dixie Fix Plan, financed cooperatively by the Federal Highway Administration, the Kentucky Transportation Cabinet, and units of local and county government in the OKI region, began in August 2005 and was concluded on June 30, 2006.

The project was administered by OKI in partnership with the Northern Kentucky Area Planning Commission (NKAPC). The agencies’ efforts were guided by an Oversight Team that included the Cities of Florence, Elsmere, Erlanger, Edgewood, Crestview Hills, Lakeside Park, Fort Mitchell, Fort Wright, Park Hills, and Covington, Boone and Kenton Counties Fiscal Courts, the Transit Authority of Northern Kentucky (TANK), Boone County Planning Commission, Kentucky Transportation Cabinet, the Northern Kentucky Chamber of Commerce, the Catholic Diocese of Covington, NKAPC, and OKI. This 19-member stakeholder group provided additional input and recommendation approvals to the plan. Monthly Oversight Team meetings were held. Seven local visioning sessions and one comprehensive public open house were also held at key points during the planning process.

The Dixie Fix Plan has been approved by the Plan’s Oversight Team on June 30, 2006 and adopted by OKI’s Executive Committee on August 10, 2006. From there, the Plan will be presented to both the Northern Kentucky Area Planning Commission and Boone County Planning Commission for adoption. The final step will be for local adoption by each of the 10 Dixie Highway municipalities.

Email comments or questions to Ms. Robyn Bancroft or call OKI at (513) 621-6300.

Conceptual Planning Recommendations

Covington - Access Management Recommendations only

Covington - TANK bus stop locations only

Crestview Hills

Edgewood

Elsmere

Erlanger North

Erlanger South

Florence

Ft. Mitchell North

Ft. Mitchell South

Ft. Wright

Lakeside Park

Park Hills

  • Completed Studies (click boxes to view studies)

    Boone County Transportation Plan

    The Boone County Transportation Study was initiated to develop a new comprehensive transportation plan for Boone County.

    View Study | Study Page

    Brent Spence Bridge Truck Ban

    This report investigates the potential for improving safety on the Brent Spence (I-71/75) Bridge by estimating the impacts of banning large trucks that originate
    outside the I-275 beltway and have no stops within the beltway from traveling on I-71/75.

    View Study | Study Page

    Campbell County Transportation Plan

    Development of this Plan involved collaborating with key stakeholders through the Campbell County Transportation Plan Task Force and interacting with the public through two sets of public meetings.

    View Study | Study Page

    Central Area Loop Study

    After 18 months of analysis, the Central Area Loop Study Advisory Committee has developed recommendations designed to decrease traffic congestion and improve mobility to downtown Cincinnati, Covington and Newport.
    View Study | Study Page

    Dearborn Co. Transportation Assessment

    OKI and Dearborn County undertook the Dearborn County Transportation Assessment in April 2003. Dearborn County is one of the fastest growing counties within the OKI region.

    Study Page

    Dixie Fix

    The Boone County Transportation Study was initiated to develop a new comprehensive transportation plan for Boone County.

    Study Page

    Dixie Highway Corridor Study

    The Dixie Fix Plan (Dixie Highway Corridor Access Management Redevelopment Plan) is a long range planning approach to relieve congestion problems and provide better access to Dixie Highway.
    View Study | Study Page

    Eastern Corridor Study

    The Dixie Fix Plan (Dixie Highway Corridor Access Management Redevelopment Plan) is a long range planning approach to relieve congestion problems and provide better access to Dixie Highway.

    View Study | Study Page

    Fort Washington Way

    In January 1997, OKI produced a plan for the revamping of Fort Washington Way, and the City approved two months later. Fort Washington Way have gone from concept to design and was completed in a short
    Study Page

    I-471 Corridor Study

    The I-471 Corridor Study will evaluate and prioritize feasible transportation improvements in Campbell County. Existing and future mobility, connectivity, accessibility, safety, congestion management and air quality issues will be addressed.

    View Study | Study Page

    I-71 / Fields Ertel / Mason Montgomery

    OKI was a funding partner with the Warren County Engineers Office on the study completed in August 2009 that identified solutions to the congestion and mobility problems at southern Warren County's Fields Ertel and Interstate 71 interchange.
     

    I-71 Corridor DEIS

    The proposed action is the development of the light rail transit (LRT) system elements for the Interstate-71 (I-71) Corridor, a transportation corridor that extends approximately 19-miles between Covington, Kentucky and Blue Ash, Ohio.
     

    ITS Architecture Update & Strategic Plan

    OKI adopted its Regional ITS Architecture Update and Strategic Plan Framework in March 2008. An Intelligent Transportation System (ITS) involves the use and integration of electronics, communications, and information processing to improve the efficiency or safety of surface transportation. Examples of ITS components include traffic management such as ARTIMIS, maintenance and construction vehicle tracking, real-time transit information, traffic signal system coordination and control, HAZMAT detection and mitigation, disaster response, and traffic data collection.
     
    Study Page

    Kenton County Transportation Plan

    The Kenton County Transportation Plan is a comprehensive, multi-modal strategy for improving transportation in Kenton County. It includes a demonstration element for linking transportation improvements with the county's future land use.

    View Study | Study Page

    Kentucky 8 Corridor

    This report provides an inventory of the existing and potential traffic conditions along Kentucky State Route 8 (KY 8/Fairfield Avenue) in the cities Bellevue and Dayton, Kentucky.
    View Study | Study Page

    North South Transportation Plan

    The North South Transportation Initiative is a comprehensive evaluation of the transportation needs within the major north/south transportation artery that spans nearly 100 miles from Northern Kentucky, through Cincinnati and Dayton to the Miami County line.

    View Study | Study Page

    Northwest Butler Transportation Plan

    (NBTS) is an in-depth study of the transportation needs and possible solutions to transportation-related problems spanning eight townships in northwest Butler County, Ohio

    View Study | Study Page

    Southwest Warren Co. Trans. Plan

    The Southwest Warren County Transportation Study was undertaken to improve mobility and safety over the next 25 years for the fastest-growing area in the OKI region.
    View Study | Study Page

    Traffic Analysis Alexandria Pike

    The report provides an inventory of current and projected traffic conditions along US27 between I-471 and KY536.
    View Study | Study Page

    US 50 Southeastern Indiana Gateway

    Dearborn County is the 10th fastest growing county in the state of Indiana, yet economic development opportunities there and in surrounding counties in southeastern Indiana are limited by the inability of US 50 to handle current traffic volumes effectively and safely.

    View Study | Study Page

    Western Hamilton Co. Trans. Study

    The Study focuses on improving mobility and safety for residents, commuters, visitors and freight. All are important factors to ensuring a healthy and vibrant quality of life.


    View Study | Study Page

    Uptown Transportation Study

    The tremendous growth of this area has created pressure on the existing communities and the related infrastructure. The Study is looking into a variety of transportation needs in Uptown including access to interstate highways, connectivity to Downtown, transit systems, parking and directional signage.
    View Study | Study Page